1. Optimal conditions are applied after reviewing specifications
- Data receipt and carrying out impedance simulations.
- Records need to be kept after designating impedance circuit width and carrying out correction during CAM work.
- After reviewing raw materials and stack-up, their commitment is carried out with optimal conditions fit for impedance
- Impedance-related products are clearly specified on the work order with daily logs attached for work records.
2. Plating thickness
- Plating thickness is managed by measuring it based on the work order standard.
3. D/F , E/T
- Film impedance points are measured and recorded.
- Records on the parts that went through E/T are kept by measuring circuit width after E/T and analyzing it on film. (influence on patterns during E/T)
- After checking impedance readings by using impedance measuring equipment, if there is any abnormality, it should be notified to the CAM/ Quality Team and then, the work should be resumed after readjusting circuit width.
4. Impedance measurement and management
- Coupon measurement for each range using measuring equipment is carried out.
- After lot-based Coupon and X-Section implementation inside real products, feedback is given as specifications on data regarding circuit width, copper and insulation layer thickness.
- NG Lot should be considered defective during measurement and handled based on the process disorder lot-processing standard.
5. Specifications/Technology
- Products and measurements after production should be managed by holding contests or review meetings and identifying problems to find solutions and provide feedback.
- Data measured by the analysis center / Optimal maintenance of impedance simulation values and real measurements should be enabled by building databases for process data.
- Entire model management should enabled after computerized/ERP registration.
Main management items of the concerned guidelines
No | Management items |
Management standards |
Measurement methods |
Cycles | Persons in charge | Management methods |
Contingency plans |
Remark |
---|---|---|---|---|---|---|---|---|
1 | Impedance | ERP | Impedance measuring instrument | LOT | Analysis center | Measuring instrument |